Northeast pipeline regulatory and shipper database (Q2 2017): Construction in progress
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
-
Regulatory status of Appalachian pipeline projects
- Environmental monitoring in the construction phase
- Delays with state permits
- Other large pipeline projects
-
Shippers on Appalachian pipeline projects
- Southwest Marcellus and Utica project map
- Northeast Pennsylvania project map
Tables and charts
This report includes the following images and tables:
-
Rover pipelineNortheast pipeline regulatory and shipper database (Q2 2017): Construction in progress: Image 2Northeast pipeline regulatory and shipper database (Q2 2017): Construction in progress: Image 3
-
Wood Mackenzie outlook on new Northeast pipeline capacity in 2017-2019Northeast pipeline regulatory and shipper database (Q2 2017): Construction in progress: Image 5Northeast pipeline regulatory and shipper database (Q2 2017): Construction in progress: Image 6
What's included
This report contains:
Other reports you may be interested in
Northeast pipeline regulatory and shipper database (Q2 2018): pipelines propose smaller projects in the region
Wood Mackenzie's Q2 2018 update to the FERC status, pipeline shippers, capacity and schematics to Northeast pipeline projects.
$950Northeast pipeline regulatory and shipper database (Q4 2017): 2018 projects are under construction
Wood Mackenzie tracks new Northeast pipeline projects. Q4 update includes their FERC status, pipeline shippers, capacity and schematic maps.
$950Northeast pipeline regulatory and shipper database (Q1 2017): Powering through
Wood Mackenzie tracks new Northeast pipeline projects. Q1 update includes their FERC status, pipeline shippers, capacity and schematic maps.
$950