Philippines LNG long-term outlook 2020
This report is currently unavailable
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- 3.3 GW of gas fired power is supplied by Malampaya
- Supply agreements needed to guarantee power and, in turn, LNG demand
- Selling exclusively into the merchant power market is possible but risky
- Selling to the industrial sector will be difficult but diesel prices provide headroom
-
Pipelines
- Current
- Proposed
-
Regasification terminals
- Pagbilao
- Batangas
- Bataan
- Downside risks
- Upside risks
- Southeast Asia Gas & Power Service
Tables and charts
This report includes the following images and tables:
- Philippines gas supply-demand balance
- LNG regas infrastructure
What's included
This report contains:
Other reports you may be interested in
Pasar copper refinery
A detailed analysis of the Pasar copper refinery.
$2,250Hindalco bauxite mines
A detailed analysis of the Hindalco bauxite mines.
$2,250West Taijinar (Hengxinrong) - Lithium brine
A detailed analysis of the West Taijinaier 1 lithium brine operation.
$2,250