Atlantic LNG - Project Summary
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Key facts
- Summary and key issues
- Project structure
- Timeline
- Shipping
- Economic assumptions
Tables and charts
This report includes the following images and tables:
- Key facts: Table 1
- Project structure: Table 1
- Timeline: Table 1
What's included
This report contains:
Other reports you may be interested in
Freeport LNG - Project Summary
Freeport LNG is a three-train LNG export terminal located in Texas. Trains 1 and 2 started operations in 2019 and Train 3 in 2020. A ...
$2,700Atlantic LNG - Train 1
ALNG Train 1 is owned and operated by a joint venture of Shell, BP, Trinidad's National Gas Company (NGC). It was mothballed in 2021.
$2,700Atlantic LNG - Train 2 & 3
Trinidad and Tobago's second liquefaction project is owned and operated by a joint venture of Shell and BP. A project Heads of ...
$2,700