Cameron LNG begins exports

This report is currently unavailable

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

First LNG at Train 1 comes four and a half years from construction starting. The original schedule was for all of the project's three trains to be producing in 2018. Despite the schedule slippage, Cameron LNG's economics remain robust. Capital costs to Cameron LNG have risen, but not by that much, and the project can break even at $2.50/mmbtu. Most of the cost overrun is being shouldered by the EPC contractor, a joint venture of CB&I and Chiyoda. CB&I's merger with McDermott, completed in May 2018, is partly a consequence of the losses incurred at Cameron, which are expected to exceed $1.5 billion.

Table of contents

    • Implications
    • US LNG pushes above 5 bcfd

Tables and charts

This report includes 1 images and tables including:

  • Feedgas to US LNG terminals

What's included

This report contains:

  • Document

    Cameron LNG begins exports

    PDF 757.13 KB