Asset Report
Darwin LNG - commercial overview
Report summary
The Darwin LNG project is a one-train LNG development operated by Santos with a nameplate capacity of 3.7 mmtpa. The Darwin LNG commercial overview outlines the project development and commercial structure. It explores the key issues facing the project, details the contracts supporting and contains plant and field location maps and an FOB breakeven analysis. See the Bayu-Undan and Barossa Area reports for details of upstream assets that feed into the project.
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Links to related report
- Commercial structure
- Timeline
- LNG output
- LNG contracts
- Shipping
- Economic analysis
Tables and charts
This report includes 12 images and tables including:
- Key facts: Table 1
- Commercial structure: Image 1
- Commercial structure: Image 2
- Timeline: Table 1
- LNG output: Image 1
- LNG contracts: Image 1
- LNG contracts: Table 1
- Shipping: Table 1
- Summary economics
- Breakeven economics (us$/mmbtu)
- FOB breakeven analysis (post-tax)
- Index Map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Oman LNG - Oman LNG - commercial overview
The foundation development at Oman LNG consisted of trains 1 & 2 each with 3.6 mmtpa capacity.
$2,250
Asset Report
Ichthys LNG - commercial overview
Ichthys is a giant gas/condensate field located in the Browse Basin, around 440 kilometres north of Broome, offshore Western Australia.
$2,250
Asset Report
Oman LNG - Qalhat LNG - commercial overview
Oman LNG's third train (formerly known as Qalhat LNG) is a 3.3 mmtpa liquefaction plant located in Sur on the north eastern coast of Oman.
$2,250