Asset report

Hadera Gateway - LNG regas terminal

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

Various locations were considered and a receiving point located 10 kilometres off the coast from Hadera was selected because of security issues and potential objections from residents to a shore side FSRU.In October 2011 the gas infrastructure company Israel Natural Gas Lines (INGL) signed an agreement with the Italian marine contractor Micoperi to install the offshore buoy and subsea pipeline connections. As well as the Advanced Production and Loading (APL) submerged turret buoy system a ...

What's included

This report contains

  • Document

    Hadera Gateway - LNG regas terminal.xls

    XLS 186.50 KB

  • Document

    Hadera Gateway - LNG regas terminal

    PDF 374.82 KB

  • Document

    Hadera Gateway - LNG regas terminal

    ZIP 426.99 KB

Table of contents

  • Key facts
  • Location maps
  • Country overview
  • Terminal overview
  • Utilisation
  • Operational basis
  • Offtake
  • Tariffs
  • Future expansions

Tables and charts

This report includes 5 images and tables including:

Images

  • Map
  • Approximate Monthly Import Data by Country

Tables

  • Key facts: Table 1
  • Key facts: Table 2
  • Key facts: Table 3

You may be interested in

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898