Lampung - LNG regas project
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Key facts
- Location maps
-
Terminal overview
- Operator and Ownership details
- EPC Contractors
- Utilisation
- Operational basis
- Offtake
- Tariffs
- Future expansions
Tables and charts
This report includes 5 images and tables including:
- Key facts: Table 1
- Key facts: Table 2
- Key facts: Table 3
- Map
- Approximate Monthly Import Data by Total
What's included
This report contains:
Other reports you may be interested in
Baía de Guanabara - LNG regas terminal
In April 2007, Petrobras agreed charters for two vessels to operate as floating regas terminals at Pecém and Baía de ...
$1,200Fujian - LNG regas terminal
The Fujian LNG facility is owned by CNOOC (60%) and Fujian Investment and Development (40%). The inaugural shipment was delivered from ...
$1,200Ratnagiri (Dabhol) - LNG regas terminal
Enron pioneered the Dabhol terminal as India's first integrated LNG and power project. The first phase of the power project was ...
$1,200