Asset Report
NFE Altamira Onshore - FLNG 2
Report summary
New Fortress Energy (NFE) plans to site, construct, and operate a new 1.4 mmtpa natural gas liquefaction facility at an under-utilized LNG regasification terminal onshore Altamira, Tamaulipas, Mexico. Start-up of NFE's second owned and operated, large scale natural gas liquefaction facility, Altamira Onshore FLNG 2, is planned for 2025 at a company estimated cost of $900 million. Under our conservative economic and operating assumptions, we estimate first LNG in 2026 and total costs of ...
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Commercial structure
- Timeline
- LNG output
- LNG contracts
-
Shipping
- Economic Assumptions
- Economic analysis
Tables and charts
This report includes 8 images and tables including:
- Key facts: Table 1
- Commercial structure: Image 1
- Timeline: Table 1
- LNG output: Image 1
- Summary economics
- Breakeven economics (US$/mmBtu)
- FOB Breakeven analysis (post-tax)
- Index Map
What's included
This report contains:
Other reports you may be interested in
Asset Report
NFE Altamira - FLNG1
New Fortress Energy (NFE) plans the initial start-up of its first company-owned and operated, large scale natural gas liquefaction ...
$2,250
Asset Report
NFE Louisiana Fast LNG - Commercial Overview
New Fortress Energy (NFE) plans to site, construct and operate a new offshore natural gas liquefaction terminal located 16 nautical ...
$2,250
Asset Report
Delfin LNG - FLNG 1
Delfin LNG is a planned floating LNG (FLNG) project located on the US Gulf Coast. It involves the construction of a deepwater port with ...
$2,250