Asset Report
Pagbilao - LNG regas terminal
Report summary
Energy World Corporation is attempting to develop a regasification terminal on Grande Island in Pagbilao, Luzon. Despite the company announcing construction has started we treat the facility as proposed because progress has been slow.The terminal has a proposed capacity of 3.0 mmtpa, but we believe that only 1.5 mmtpa will be initially operational given the relatively small capacity size of the associated power plant, the current lack of gas pipeline infrastructure to connect the terminal ...
Table of contents
- Key facts
- Location maps
- Terminal overview
- Utilisation
- Operational basis
- Offtake
- Tariffs
- Future expansions
Tables and charts
This report includes 4 images and tables including:
- Key facts: Table 1
- Key facts: Table 2
- Key facts: Table 3
- Map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Sabine Pass - LNG regas terminal
Update Status Cheniere announced that it would no longer be pursuing development of a regas project at Sabine Pass. Due to the growth ...
$1,200
Asset Report
Lithuania - LNG regas terminal
The Klaipeda LNG terminal is the only operational LNG terminal in the Baltics, providing an alternative to Russian gas
$1,200
Asset Report
Zeebrugge - LNG regas terminal
The Zeebrugge LNG regasification terminal asset report
$1,200