Asset report

Peru LNG - Peru LNG Pipelines

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

Peru LNG uses two pipelines to transfer gas from Block 56 to the PLNG plant. Gas is initially transported along the 32 inch 211 kilometre (131 mile) section of the Transportadora Gas del Perú (TGP) pipeline running through the Amazon jungle from the Malvinas processing facility to Chiquintirca. From Chiquintirca it is then transported along a new 34 inch 408 kilometre (254 mile) pipeline constructed by the Peru LNG partners to the plant. As the TGP pipeline is owned by a ...

What's included

This report contains

  • Document

    Peru LNG Pipelines

    PDF 256.19 KB

Table of contents

  • Key facts
  • Development
  • Throughput
  • Costs
  • Gas sales
  • Economic assumptions
  • Fiscal and regulatory

Tables and charts

This report includes 1 images and tables including:

Tables

  • Key facts: Table 1

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898