Portovaya LNG - Commercial Overview
Report summary
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Commercial structure
- Timeline
- LNG output
- LNG contracts
- Shipping
- Economic analysis
Tables and charts
This report includes 8 images and tables including:
- Key facts: Table 1
- Timeline: Table 1
- LNG output: Image 1
- Summary economics
- Breakeven economics (US$/mmBtu)
- FOB breakeven analysis (post-tax)
- Index map
- Detail Map
What's included
This report contains:
Other reports you may be interested in
26 November 2019
Oman LNG - Qalhat LNG - commercial overview
Oman LNG - Qalhat LNG - commercial overview
Oman LNG's third train (formerly known as Qalhat LNG) is a 3.3 mmtpa liquefaction plant located in Sur on the north eastern coast of Oman.
$2,25026 November 2019
Oman LNG - Oman LNG - commercial overview
Oman LNG - Oman LNG - commercial overview
The foundation development at Oman LNG consisted of trains 1 & 2 each with 3.6 mmtpa capacity.
$2,25012 May 2020
Darwin LNG - commercial overview
Darwin LNG - commercial overview
The Darwin LNG plant is located at Wickham Point in the city of Darwin, northern Australia. The plant began LNG production in 2006.
$2,250