Asset Report
Sabine Pass Export - Phase 5 Expansion
Report summary
Sabine Pass LNG Phase 5 Expansion is a two-train expansion to the six-train Sabine Pass LNG export development. Sabine Pass Liquefaction (SPL) operates the six trains as a single, integrated facility and this expansion would operate as an adjacent but separate facility. The terminal is on the Sabine Neches Waterway, in southwest Louisiana. The expansion project consists of two trains each with a nameplate capacity of 7.0 mmtpa. In addition to the 14.0 mmtpa of new liquefaction capacity, the ...
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Commercial structure
- Timeline
-
LNG output
- Plant
- Pipeline
- LNG contracts
-
Shipping
- Economic Assumptions
- Economic analysis
Tables and charts
This report includes 10 images and tables including:
- Key facts: Table 1
- Commercial structure: Image 1
- Timeline: Table 1
- LNG output: Image 1
- LNG contracts: Image 1
- LNG contracts: Table 1
- Summary economics
- Breakeven economics (US$/mmBtu)
- FOB breakeven analysis (post-tax)
- Index Map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Sabine Pass Export - Phase 1
Sabine Pass LNG Phase 1 is the first two trains of a six-train LNG export development. Sabine Pass Liquefaction (SPL) operates the six ...
$2,250
Asset Report
Sabine Pass Export - Phase 2
Sabine Pass LNG Phase 2 is the third and fourth train of a six-train LNG export development. Sabine Pass Liquefaction (SPL) operates ...
$2,250
Asset Report
Sabine Pass Export - Project Summary
Sabine Pass LNG is a six-train LNG project located in Louisiana. Cheniere Energy Partners owns 100% equity in the plant via its ...
$2,250