Asset Report

Afton-Ajax Restart gold mine

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

This analysis of the Afton-Ajax Restart Project assumes an on open pit mining operation with a 65kt/d processing plant and is based on the updated Feasibility Study released in Q1 2016, reflecting scope changes and revised project economics. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Mining
    • Power
  • CAPEX

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Afton-Ajax Restart gold mine

    XLS 118.00 KB