Asset Report
Aguilar zinc mine
Report summary
Aguilar is a SEDEX deposit combined with a contact replacement deposit being mined by underground method since 2018. Before it was mined by both underground and open pit methods. The material is processed through a 2.4ktpd mill which produces a zinc concentrate and a lead concentrate. All lead concentrate is treated at Glencore’s Palpala lead smelter and all zinc concentrate is exported. The Aguilar zinc concentrate contains around 1.5%Mn. A major challenge for the mine is to increase their reserves and resources which have decreased considerably in the past few years.
Table of contents
- Summary
- Key issues
- Mining
- Processing
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
10 December 2019
Hellyer Mine Restart (Closed) zinc mine
Asset Report
Hellyer Mine Restart (Closed) zinc mine
A detailed analysis of the Hellyer Mine Restart zinc mine.
$2,25013 September 2019
Rampura- Agucha zinc mine
Asset Report
Rampura- Agucha zinc mine
A detailed analysis of the Rampura- Agucha zinc mine.
$2,25013 September 2019
Gamsberg zinc mine
Asset Report
Gamsberg zinc mine
A detailed analysis of the Gamsberg zinc mine.
$2,250Trusted by leading organisations








