Asset report

Akita zinc smelter

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

T he Akita zinc smelter was commissioned in 1953 with a capacity of 7kt/a. This was expanded to 100kt/a by 1973. However due to ongoing losses through the early 1990s the decision was made to close the smelter in 1996. However some alloying operations are still carried out on the site. This analysis was discontinued from 1997 onwards.

What's included

This report contains

  • Document

    Akita zinc smelter.xls

    XLS 413.00 KB

  • Document

    Akita zinc smelter

    PDF 660.46 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Process overview
  • Products
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 8 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Products: Table 1
  • Process overview: Table 1
  • Roaster & Acid plant
  • Leaching & Purification
  • Tankhouse, melting & Casting

You may be interested in?

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898