Asset report

Aktogay copper minesite

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

The Aktogay minesite project comprises oxide and sulphide deposits and is located 250km from the Kazakhstan China border. Oxide ore will be processed on site at an SxEw plant producing 15kt/a of copper cathode equivalent. Sulphide mineralisation beneath the oxide deposit will be processed at an on site concentrator producing 90kt/a of copper cathode equivalent and molybdenum as a by product. Mine life is estimated at 50 years...

What's included

This report contains

  • Document

    Aktogay copper minesite project

    XLS 546.00 KB

  • Document

    Aktogay copper minesite

    PDF 1.02 MB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Reserves and resources
  • Infrastructure
  • Costs
  • Production
  • Operations
  • Timeline

Tables and charts

This report includes 4 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1
  • Reserves and resources: Table 1
  • Costs: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898