Asset Report

Asanko - Obotan gold mine project

Get this report

$2,250

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

19 May 2021

Asanko - Obotan gold mine project

Report summary

The Asanko project was derived from the combination of two standalone (Obotan & Esaase) projects. The Obotan deposit will be developed as Phase 1, while the Esaase deposit will be developed as Phase 2. Both deposits will be mined by open-pit methods. Ore from Esaase will be transported 27km by overland conveyor to a carbon in leach plant at Obotan. Commercial production (Phase 1) was declared in April 2016 and board approval for Phase 2 expansion (5Mt/a expansion) was announced in November. In 2018, 223koz of gold was produced as the mill ramped up to full production. For 2020, full year gold production is estimated at ~235koz.

Table of contents

  • Summary
  • Key issues
  • Mining
  • Processing
  • Power
  • CAPEX

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Obotan Project gold mine

    XLS 120.50 KB

  • Document

    Asanko - Obotan gold mine project

    PDF 1.13 MB

  • Document

    Asanko - Obotan gold mine project

    ZIP 1.10 MB

  • Document

    Obo_flex.xlsx

    XLSX 367.48 KB