Asset Report

Asanko - Obotan gold mine project

From

$1,350.00

You can pay by card or invoice

From

$1,350.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The Asanko project was derived from the combination of two standalone (Obotan & Esaase) projects. The Obotan deposit will be developed as Phase 1, while the Esaase deposit will be developed as Phase 2. Both deposits will be mined by open-pit methods. Ore from Esaase will be transported 27km by overland conveyor to a carbon in leach plant at Obotan. Commercial production (Phase 1) was declared in April 2016 and board approval for Phase 2 expansion (5Mt/a expansion) was announced in November. In 2016, 148koz of gold was produced as the mill operated 20% above nameplate capacity at 3.6Mt/a. For 2017, full year gold production is estimated at 205 - 225koz.

What's included

This report contains

  • Document

    Obotan Project gold mine

    XLS 124.50 KB

  • Document

    Asanko gold mine

    PDF 463.47 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Tables

  • Key facts: Table 1

Images

  • Detailed map

You may be interested in

Asset Report

Ahafo gold mine

Asset Report

Tarkwa gold mine

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898