Asset report

Asanko - Obotan gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

The Asanko project was derived from the combination of two standalone (Obotan & Esaase) projects. The Obotan deposit will be developed as Phase 1, while the Esaase deposit will be developed as Phase 2. Both deposits will be mined by open-pit methods. Ore from Esaase will be transported 27km by overland conveyor to a carbon in leach plant at Obotan.Commercial production (Phase 1) was declared in April 2016 and board approval for Phase 2 expansion (5Mt/a expansion) was announced in November. In 2016, 148koz of gold was produced as the mill operated 20% above nameplate capacity at 3.6Mt/a.For 2017, full year gold production is estimated at 205 - 225koz.

What's included

This report contains

  • Document

    Obotan Project gold mine

    XLS 124.50 KB

  • Document

    Asanko gold mine

    PDF 463.47 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898