Asset Report

Asanko - Obotan gold mine project

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The Asanko project was derived from the combination of two standalone (Obotan & Esaase) projects. The Obotan deposit will be developed as Phase 1, while the Esaase deposit will be developed as Phase 2. Both deposits will be mined by open-pit methods. Ore from Esaase will be transported 27km by overland conveyor to a carbon in leach plant at Obotan. Commercial production (Phase 1) was declared in April 2016 and board approval for Phase 2 expansion (5Mt/a expansion) was announced in November. In 2018, 223koz of gold was produced as the mill ramped up to full production. For 2020, full year gold production is estimated at ~235koz.

Table of contents

  • Summary
  • Key issues
  • Emissions
  • Mining
  • Processing
  • Power
  • CAPEX

Tables and charts

This report includes 2 images and tables including:

  • Asanko-Obotan Emission Intensity Quartile ranking – total global production - tonnes Au equivalent
  • Detailed map

What's included

This report contains:

  • Document

    Obotan Project gold mine

    XLS 123.00 KB

  • Document

    Asanko - Obotan gold mine project

    PDF 1.66 MB

  • Document

    Asanko - Obotan gold mine project

    ZIP 1.10 MB