Asset Report
Asmara copper mine project
Report summary
The Asmara project consists of four VMS deposits: the Debarwa deposit 25km south of Asmara, and the Northern deposits (Emba Derho, Adi Nefas and Gupo Gold) located 15km north of Asmara. In May 2012, a pre-feasibility study on Asmara projects was completed and a feasibility study was initiated in June 2012. Feasibility study was completed in May 2013. Feasibility study estimated a mine life of 17 years with average annual production of 22kt Cu, 50kt Zn, 26koz Au and 11Moz Ag.
Table of contents
- Summary
- Key issues
- Emissions
- Debarwa
- Emba Derho
- Adi Nefas
- Gupo
- CAPEX
Tables and charts
This report includes 2 images and tables including:
- Asmara Emission Intensity Quartile ranking – tonnes of Cu equivalent
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Udokan copper mine project
A detailed analysis of the Udokan copper mine.
$2,250
Asset Report
Ravensthorpe Gold/Copper copper mine project
A detailed analysis of the Ravensthorpe Gold/Copper copper mine project.
$2,250
Asset Report
Pebble copper mine project
A detailed analysis of the Pebble copper mine project.
$2,250