Asset report

Back Forty zinc mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

Back Forty is a complex polymetallic deposit. It includes both sulphide mineralisation and gold bearing gossans. The Preliminary Economic Assessment (PEA) released in July 2014 planned for the project's sulphide ore to follow a conventional open pit and differential flotation process to produce copper zinc and lead concentrates. It also included a separate agitated leaching route to recover gold silver dore from the oxide ore.

What's included

This report contains

  • Document

    Back Forty zinc mine project

    PDF 788.09 KB

  • Document

    Back Forty zinc mine project

    XLS 504.00 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898