Asset report

Back Forty zinc mine project

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

Back Forty is a complex polymetallic deposit. It includes both sulphide mineralisation and gold bearing gossans. The Preliminary Economic Assessment (PEA) released in July 2014 planned for the project's sulphide ore to follow a conventional open pit and differential flotation process to produce copper zinc and lead concentrates. It also included a separate agitated leaching route to recover gold silver dore from the oxide ore.

What's included

This report contains

  • Document

    Back Forty zinc mine project

    PDF 788.09 KB

  • Document

    Back Forty zinc mine project

    XLS 504.00 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Reserves and resources
  • Operations
  • Infrastructure
  • Costs
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898