Asset report

Baoji (ISF) zinc smelter

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

In late 2003 construction started on a greenfield site 27km North of Baoji of a 100kt/a zinc lead ISF smelter with a design capacity of 67kt/a zinc as SHG and 33kt/a refined lead. Commercial production commenced in June 2006.

What's included

This report contains

  • Document

    Baoji (ISF) zinc smelter

    PDF 542.96 KB

  • Document

    Baoji (ISF) zinc smelter.xls

    XLS 516.00 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Projects
  • Process overview
  • Products
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 3 images and tables including:

Images

  • Location maps: Image 1
  • Flowsheet

Tables

  • Key facts: Table 1

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898