Asset Report

Bartlesville zinc smelter

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The Bartlesville smelter had a slab zinc capacity of 42kt per annum at time of closure in 1993. In this analysis, the plant is treated as closed from 1994 as primary zinc smelting had ceased although ZnO calcine from the Pb/Cd circuit was still produced on the site. The calcine was sent to Monaco for smelting. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key Issues
  • AT TIME OF CLOSURE
  • AT TIME OF CLOSURE

Tables and charts

This report includes 6 images and tables including:

  • Detailed map
  • Feed Preparation
  • Roaster and Acid Plant
  • Leaching and Purification
  • Tankhouse, Melting and Casting

What's included

This report contains:

  • Document

    Bartlesville zinc smelter

    PDF 1.19 MB

  • Document

    Bartlesville zinc smelter

    ZIP 1.10 MB