Asset Report

Juiz de Fora zinc smelter

Get this report

$1,800

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

09 June 2017

Juiz de Fora zinc smelter

Report summary

The smelter was commissioned in 1980 with a capacity of 35kt/a zinc (tankhouse-limited) and 52kt/a sulphuric acid at a cost of US$63M, location being chosen through fiscal incentives.  Ownership was by a private company, Companhia Paraibuna de Metais (CPM).  In 1986 a US$15M expansion increased capacity to 49kt/a zinc and rectified the tankhouse limitation, and the introduction of oxygen on the roaster in 1987 and the installation of a liquid sulphur dioxide plant increased capacity to...

Table of contents

  • Key facts
  • Summary and key issues
  • Projects
  • Location maps
  • Participation
    • Other
  • Products
  • Costs
  • Economic assumptions

Tables and charts

This report includes 14 images and tables including:

  • Key facts: Table 1
  • Location maps: Image 1
  • Participation: Table 1
  • Flowsheet
  • Process overview: Table 1
  • Process overview: Table 2
  • Process overview: Table 3
  • Process overview: Table 4
  • Products: Image 1
  • Products: Table 1
  • Products: Table 2
  • Costs: Image 1
  • Costs: Table 1
  • Economic assumptions: Table 1

What's included

This report contains:

  • Document

    Juiz de Fora zinc smelter

    PDF 1.23 MB

  • Document

    Juiz de Fora zinc smelter.xls

    XLS 470.00 KB