Asset Report

Juiz de Fora zinc smelter

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The smelter was commissioned in 1980 with a capacity of 35kt/a zinc (tankhouse-limited) and 52kt/a sulphuric acid at a cost of US$63M, location being chosen through fiscal incentives. Ownership was by a private company, Companhia Paraibuna de Metais (CPM). In 1986 a US$15M expansion increased capacity to 49kt/a zinc and rectified the tankhouse limitation, and the introduction of oxygen on the roaster in 1987 and the installation of a liquid sulphur dioxide plant increased capacity to...

Table of contents

  • Emissions
  • Other

Tables and charts

This report includes 8 images and tables including:

  • Juiz de Fora Zinc Smelter Elkview Emission Intensity Quartile Ranking – total global production - tonnes Zn
  • Detailed map
  • Flowsheet
  • Feed Preparation
  • Roaster and Acid Plant
  • Leaching and Purification
  • Tankhouse, Melting and Casting

What's included

This report contains:

  • Document

    Juiz de Fora zinc smelter

    PDF 1.70 MB

  • Document

    Juiz de Fora zinc smelter

    ZIP 1.19 MB