Bayannaoer (Zijin) zinc smelter

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Construction of the smelter started in 2005, with completion and commissioning in May 2006. Design capacity was 100kt/a slab zinc and 190kt/a sulphuric acid. The smelter uses the Jarosite residue process. Commissioning of an expansion of the smelter by 100kt/a to 200kt/a slab zinc, comprising a separate plant alongside the existing smelter was completed in 2009. Most plant areas were twinned in the expansion, however only one casting plant is used for both production lines.

Table of contents

  • Summary
  • Key issues
  • Other

Tables and charts

This report includes 7 images and tables including:

  • Detailed map
  • Xamba (Zijin) Electrolytic Flowsheet
  • Feed Preparation
  • Roaster and Acid Plant
  • Leaching and Purification
  • Tankhouse, Melting and Casting

What's included

This report contains:

  • Document

    Bayannaoer (Zijin) zinc smelter

    PDF 1.23 MB

  • Document

    Xamba (Zijin) zinc smelter

    ZIP 1.15 MB