Asset Report
Bisha zinc mine
Report summary
The project is to be developed in three distinct phases. Surface oxide ores will be treated to recover gold and silver for the first two years of production. For the following three years copper concentrate will be produced from a supergene ore. Thereafter copper and zinc concentrates will be produced from the primary sulphide ore. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Emissions
- Mining
- Process
- CAPEX
Tables and charts
This report includes 2 images and tables including:
- Bisha Emission Intensity Quartile ranking – total global production - tonnes Zn equivalent
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
San Valentin zinc mine
A detailed production and cost competitive analysis of the Valentin zinc mine.
$2,250
Asset Report
Pomorzany-Olkusz zinc mine
A detailed analysis of the Pomorzany-Olkusz zinc mine.
$2,250
Asset Report
Morococha zinc mine
A detailed production, commercial and competitive cost analysis of the Morococha zinc mine.
$2,250