Asset Report
Boleo SxEw copper mine
Report summary
The mine started operating in 2015. The initial proposed Boleo project comprised an underground mine, supplemented by production from a series of open pits to feed 2.8Mt/a of ROM ore to a hydro-metallurgical facility designed to produce up to 30kt/a cathode copper, 700t/a of cobalt and 10.5kt/a of zinc sulphate. The area of the mine was previously exploited for its copper reserves from 1888 until 1972 with approximately 18Mt of ore treated.
Table of contents
- Summary
- Key issues
- CAPEX
- Mining
- Processing
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Milpillas SxEw copper mine
A detailed production and cost competitive analysis of the Milpillas SxEw copper mine.
$2,250
Asset Report
Carmacks SxEw copper mine project
A detailed analysis of the Carmacks SxEw copper mine project.
$2,250
Asset Report
Monywa SxEw copper mine
A detailed analysis of the Monywa SxEw copper mine.
$2,250