Asset report

Bongara Restart zinc mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image
For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The Bongara Restart project assumes open pit mining methods. The processing method was still not defined by the end of 2017. However, the Waelz Kiln treatment method was under consideration. Between March 2007 to July 2008, the mine produced about 25,000 tonnes of zinc. It was put under care and maintenance when zinc prices declined.

What's included

This report contains

  • Document

    Bongara Restart zinc mine project

    PDF 636.45 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Images

  • Location maps: Image 1

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898