Asset Report

Iscaycruz Restart zinc mine project

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

In October 2015 Glencore announced the temporarily suspension of operations at Iscaycruz and other mine operations. Glencore shut down operations by November 2015 and the operation continued on care and maintenance throughout H1 2019. Operations resumed with open pit operations and underground operations shortly after. The expected life of Iscaycruz is around 3 years based on reserves and 5 years based on resources. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
    • Detailed map
  • Mining
  • Processing
  • Royalties and taxes

Tables and charts

This report includes 4 images and tables including:

  • Iscaycruz Restart Emission Intensity Quartile ranking – Total global production - Tonnes Zn equivalent

What's included

This report contains:

  • Document

    Iscaycruz Restart zinc mine project

    XLS 355.00 KB

  • Document

    Iscaycruz Restart zinc mine project

    PDF 1.48 MB

  • Document

    Iscaycruz Restart zinc mine project

    ZIP 1.04 MB