Asset Report
Bor copper refinery
Report summary
The refinery is located at Bor, 150km south-east of Belgrade, and has good rail links. It treats anodes from the adjacent Bor smelter. Although mining and smelting commenced at Bor in 1904, a 12kt/a refinery was only commissioned in 1938. A new refinery was built in 1946 with a capacity of 38kt/a cathode and was expanded to a capacity of 130kt/a in 1973 and to 165kt/a in 1978. Plans for a further expansion to 175kt/a cathode in 1990 were not implemented due to the uncertain political...
Table of contents
- No table of contents specified
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Asset Report
Bor copper smelter
A detailed analysis of the Bor copper smelter.
$2,250
Asset Report
Yunnan (Kunming) copper refinery
A detailed analysis of the Yunnan (Kunming) copper refinery.
$2,250
Asset Report
Chifeng Jinfeng (closed) copper refinery
A detailed analysis of the Chifeng Jinfeng copper refinery.
$2,250