Asset report

Bur zinc mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

An underground mining operation is planned producing zinc and copper with gold and silver by products over a 3 year mine life. Ore will be processed at the company's Flin Flon or Snow Lake concentrators (located within the region) to produce zinc and copper concentrates. Feed from the Bur mine could be used to utilise spare capacity at the mill as operations cease at the company's mature 777 mine (also located within the Flin Flon region).

What's included

This report contains

  • Document

    Bur Project zinc mine

    XLS 484.50 KB

  • Document

    Bur zinc mine project

    PDF 519.85 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Costs
  • Operations
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898