The Calipatria zinc plant was a project intending to recover zinc from waste brine following the recovery of geothermal energy. The process was unique but difficulties in commissioning meant the operation was abandoned in 2004. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.