The Jilang smelter commenced production in late 2005 with an initial zinc smelting capacity of 18kt/a. It expanded capacity to 50kt/a in 2009, followed by further expansion to 70kt/a in 2014 and 100kt/a in 2022. Aside from a major zinc producer, the smelter also has 100t/a capacity of refined indium. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues

Tables and charts

This report includes 6 images and tables including:

  • Feed Preparation
  • Roaster and Acid Plant
  • Leaching and Purification
  • Tankhouse, Melting and Casting

What's included

This report contains:

  • Document

    Jilang Indium (Zinc) zinc smelter

    PDF 912.91 KB