Asset report

Cameron gold mine project

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

The project is anticipated to be a combination of open pit and underground mining. Open pit mining (to a depth of 250m) will utilise conventional open pit methods while underground mining is planned using sub level open stoping methods. Mine life for combined operations is estimated at 10 years. The plant will have a design capacity of 1Mt/a and comprise a carbon in leach (CIL) circuit.

What's included

This report contains

  • Document

    Cameron gold mine project

    XLS 122.50 KB

  • Document

    Cameron gold mine project

    PDF 684.69 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Reserves and resources
  • Operations
  • Infrastructure
  • Costs
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in?

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898