Can the need for new zinc smelting capacity navigate the ESG agenda?
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- The need for new capacity
-
The project pipeline
- Environmental
- Case study: China
- Social
- Case study: India
- Corporate governance
- Don’t forget ESG
Tables and charts
This report includes the following images and tables:
- Requirement for new zinc smelter capability
- Possible zinc smelter projects
- Conceptual zinc smelter projects
What's included
This report contains:
Other reports you may be interested in
2025 zinc benchmark TC: a new era or a strategic move?
The 2025 annual zinc benchmark contract treatment charge is understood to have been settled. Was this a strategic move by smelters?
$1,050Lanping zinc mine
A detailed analysis of the Lanping zinc mine.
$2,250Orsk zinc smelter project
A detailed analysis of the Orsk zinc smelter project.
$2,250