Asset Report

Cartagena (Escombreras) zinc smelter project

From

$1,350.00

You can pay by card or invoice

From

$1,350.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image
For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The Cartagena (Escombreras) zinc smelter project was part of a recovery plan put in place for the then existing Cartagena smelter owned by Española del Zinc. The project involved the construction of a new smelter to operate by entirely treating secondary materials from steel recycling plants. It was proposed to commission in late 2011 with a production capacity of 65kt/a but Española del Zinc was declared insolvent the year before. 

What's included

This report contains

  • Document

    Cartagena (Escombreras) zinc smelter project

    PDF 625.34 KB

Table of contents

  • Key facts
    • Summary
    • Key Issues
  • Location maps
    • Location / Transport
    • Conc. Receipt / Storage
    • Roaster
    • Acid Plant
    • Leach Plant
    • Purification
    • Tankhouse
    • Casting Plant
    • Residue Disposal
  • Products

Tables and charts

This report includes 3 images and tables including:

Tables

  • Key facts: Table 1

Images

  • Detailed map
  • Flowsheet

You may be interested in

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898