Asset Report

Chambishi (NFC) copper smelter

From

$1,350.00

You can pay by card or invoice

From

$1,350.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image
For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The smelter is located in Chambishi and it uses the ISASMELTTM technology. The capacity is 800kt/a conc (270kt/a copper) and the sulphur collection efficiency is 86%.

What's included

This report contains

  • Document

    Chambishi (NFC) copper smelter

    PDF 544.52 KB

  • Document

    Chambishi (NFC) copper smelter.xls

    XLS 478.00 KB

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Participation
  • Process overview
  • Products
  • Costs
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 13 images and tables including:

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Feed preparation
  • Smelting process
  • Auxiliary plants
  • Products: Table 1
  • Products allocation
  • Costs: Table 1
  • Economic assumptions: Table 1

Images

  • Detailed map
  • Flowsheet
  • Production
  • Costs: Image 1

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898