The Chanderiya ISF smelter was commissioned in late 1991 to treat zinc and lead concentrates from the Rampura-Agucha Mine. Capacity at commissioning was 70kt/a zinc and 35kt/a lead. The complex also includes a lead refinery, a precious metals refinery, bismuth and mercury plants, and a plant to produce copper cathode from copper dross arising from lead refining. The capital cost of the total installation was US$125M. Following a number of commissioning problems, production became more...
Table of contents
- Location / Transport
- Conc. Receipt / Storage
- Sinter Plant
- Acid Plant
- Smelting Furnace
- Refining
- Casting Plant
- Slag Disposal
- Other
Tables and charts
This report includes 1 images and tables including:
What's included
This report contains:
Other reports you may be interested in
Asset Report
Shaoguan (ISF) zinc smelter
A detailed analysis of the Shaoguan (ISF) zinc smelter.
$2,250
Asset Report
Duisburg (ISF) zinc smelter
A detailed analysis of the Duisburg (ISF) zinc smelter.
$2,250
Asset Report
Harima (ISF) zinc smelter
A detailed analysis of the Harima (ISF) zinc smelter.
$2,250