Chiba steel plant
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key issues
- Participation
- Steel plant overview
- Key raw materials rates
- Iron ore
- Coal
- Coke
- Metallics
-
Energy
- Downstream products
- Capital costs
- Operating cash costs
Tables and charts
This report includes the following images and tables:
- Detailed map
- Finished steel cost (US$/tonne)
- Operation cash costs table (US$/tonne)
- Production table (Mtpa)
- Finished steel production (Mt)
What's included
This report contains:
Other reports you may be interested in
Jambi Merang
Jambi Merang PSC is major domestic gas producer onshore South Sumatra Province.
$3,720K5
K5 is a reservoir with a massive 21-tcf gas-initially-in-place. It was discovered in 1970, but it has a high CO2 content of up to 70%. ...
$3,720Kadanwari
The Kadanwari gas field, located in the Middle Indus Basin of Pakistan, was discovered in 1989 by LASMO. The primary producing ...
$3,720