Asset Report
Chibuluma West copper mine
Report summary
Chibuluma West was shut in 2005, and lies 12 km north of the Chibuluma South operation which is covered by a separate analysis. The analysis included here shows production post-privatisation. Production prior to October 1 1997 is included in a separate analysis for Nkana. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Mining
- Processing
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Chibuluma South copper mine
A detailed analysis of the Chibuluma South copper mine.
$2,250
Asset Report
Deerni copper mine
A detailed analysis of the Deerni copper mine.
$2,250
Asset Report
West Whundo copper mine project
A detailed analysis of the West Whundo copper mine project.
$2,250