Asset Report

Chifeng Jinjian copper refinery

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The Jinjian refinery was commissioned in 2003 with an initial capacity of 20kt/a pf copper cathode. A 40kt/a expansion was started in 2005 and was commissioned by the end of 2006. The cost of the expansion was approximately $10M. The capacity as of 2010 was 100kt/a of copper cathode. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Emissions

Tables and charts

This report includes 2 images and tables including:

  • Chifeng Jinjian Copper Refinery Emission Intensity Quartile Ranking - total global production - tonnes Cu
  • Detailed map

What's included

This report contains:

  • Document

    Chifeng Jinjian copper refinery

    PDF 1.63 MB

  • Document

    Chifeng Jinjian copper refinery

    ZIP 1.12 MB