This South African smelter project has been under study since 1996. In December 1998 it was announced that Mitsui Mining and Smelting, which originally had a 24.5% stake in the project, had pulled out, and a new partner was being sought. Mitsui's withdrawal left the project requiring another partner and further delays resulted. The project here assumed the original flowsheet of the late 1990s. The original estimated cost of the project was US$600-650M for a capacity of 220kt/a, but this...