Asset Report
Coega Bay zinc smelter project
Report summary
This South African smelter project has been under study since 1996. In December 1998 it was announced that Mitsui Mining and Smelting, which originally had a 24.5% stake in the project, had pulled out, and a new partner was being sought. Mitsui's withdrawal left the project requiring another partner and further delays resulted. The project here assumed the original flowsheet of the late 1990s. The original estimated cost of the project was US$600-650M for a capacity of 220kt/a, but this...
Table of contents
- Roaster
- Acid Plant
- Leach Plant
- Tankhouse
- Casting Plant
- Residue Disposal
- Other
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Asset Report
Kirovgrad zinc smelter project
A detailed analysis of the Kirovgrad zinc smelter project.
$2,250
Asset Report
Huili zinc smelter project
A detailed analysis of the Huili zinc smelter project.
$2,250
Asset Report
Cartagena (Escombreras) zinc smelter project
A detailed analysis of the Cartagena (Escombreras) zinc smelter project.
$2,250