Asset Report

Huili zinc smelter project

Get this report

$2,250

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQ's about online orders
- Find out more about subscriptions

28 November 2018

Huili zinc smelter project

Report summary

Sichuan Huili Zinc & Lead Co. Ltd. is the current name of the former Sichuan Huili Zinc Minc Co. Ltd. who planned to construct a zinc smelter to use their local zinc concentrate. Design of the new zinc smelter with 100kt/a slab zinc was completed in 2010 but construction did not start immediately due to a weak market and shortage of funds. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Flowsheet
  • Residue Disposal
  • Other

Tables and charts

This report includes 13 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Huili zinc smelter project.xls

    XLS 412.00 KB

  • Document

    Huili zinc smelter project

    PDF 1.08 MB

  • Document

    Huili zinc smelter project

    ZIP 1.13 MB

Trusted by leading organisations