Asset Report

Copsa Mica zinc smelter

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Zinc smelting began at Copsa Mica in 1939, with the first ISF commissioning in 1966. However even with continuing increases in capacity, the overall operations at the site have been problematic, and in January 2009, a "temporary stop in production" was announced due to falling metal prices. This "temporary stop" is still ongoing, and for the purposes of this analysis it is assumed that due to the investment required, notably for environmental improvements, the smelter will not re-start.

Table of contents

  • Location / Transport
  • Conc. Receipt / Storage
  • Sinter Plant
  • Acid Plant
  • Smelting Furnace
  • Refining
  • Casting Plant
  • Slag Disposal
  • Other

Tables and charts

No table or charts specified

What's included

This report contains:

  • Document

    Copsa Mica zinc smelter

    PDF 1.32 MB

  • Document

    Copsa Mica zinc smelter

    ZIP 6.82 MB