Asset Report

Copsa Mica zinc smelter

From

$1,350.00

You can pay by card or invoice

From

$1,350.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

Zinc smelting began at Copsa Mica in 1939, with the first ISF commissioning in 1966. However even with continuing increases in capacity, the overall operations at the site have been problematic, and in January 2009, a "temporary stop in production" was announced due to falling metal prices. This "temporary stop" is still ongoing, and for the purposes of this analysis it is assumed that due to the investment required, notably for environmental improvements, the smelter will not re-start.

What's included

This report contains

  • Document

    Copsa Mica (ISF) closed zinc smelter

    XLS 266.50 KB

  • Document

    Copsa Mica zinc smelter

    PDF 1.14 MB

Table of contents

  • Key facts
    • Summary
    • Key Issues
  • Location maps
    • Location / Transport
    • Conc. Receipt / Storage
    • Sinter Plant
    • Acid Plant
    • Smelting Furnace
    • Refining
    • Casting Plant
    • Slag Disposal
    • Other
  • Products
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 3 images and tables including:

Tables

  • Key facts: Table 1

Images

  • Location maps: Image 1
  • Flowsheet

You may be interested in

Asset Report

Mengzi zinc smelter

Asset Report

Kaili zinc smelter

Questions about this report?

  • Europe:
    +44 131 243 4400
  • Americas:
    +1 713 470 1600
  • Asia Pacific:
    +65 6518 0800