Asset report

Copsa Mica zinc smelter

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

Zinc smelting began at Copsa Mica in 1939 with the first ISF commissioning in 1966. However even with continuing increases in capacity the overall operations at the site have been problematic and inJanuary 2009 a "temporary stop in production" was announced due to falling metal prices. This "temporary stop" is still ongoing and for the purposes of this analysis it is assumed that due to the investment required notably for environmental improvements the smelter will not re start.

What's included

This report contains

  • Document

    Copsa Mica (ISF) closed zinc smelter

    XLS 266.50 KB

  • Document

    Copsa Mica zinc smelter

    PDF 1.14 MB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Process overview
  • Products
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 3 images and tables including:

Images

  • Location maps: Image 1
  • Flowsheet

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898