Asset Report

Copsa Mica zinc smelter

Get this report

$1,800

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

10 February 2015

Copsa Mica zinc smelter

Report summary

Zinc smelting began at Copsa Mica in 1939, with the first ISF commissioning in 1966. However even with continuing increases in capacity, the overall operations at the site have been problematic, and in January 2009, a "temporary stop in production" was announced due to falling metal prices. This "temporary stop" is still ongoing, and for the purposes of this analysis it is assumed that due to the investment required, notably for environmental improvements, the smelter will not re-start.

Table of contents

  • Key facts
    • Summary
    • Key Issues
  • Location maps
    • Location / Transport
    • Conc. Receipt / Storage
    • Sinter Plant
    • Acid Plant
    • Smelting Furnace
    • Refining
    • Casting Plant
    • Slag Disposal
    • Other
  • Products
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 3 images and tables including:

  • Key facts: Table 1
  • Location maps: Image 1
  • Flowsheet

What's included

This report contains:

  • Document

    Copsa Mica (ISF) closed zinc smelter

    XLS 266.50 KB

  • Document

    Copsa Mica zinc smelter

    PDF 1.14 MB