Asset report

Cripple Creek & Victor (Pikes Peak) gold mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

Cripple Creek is a typical open pit operation using trucks and shovels. All the ore was heap leached prior to 2015 but as part of a Mine Life Expansion programme (MLE 2) programme a 2Mt/a mill was constructed to treat the high grade ore i.e ore grades greater than 2.3g/t.

What's included

This report contains

  • Document

    Cripple Creek & Victor (Pikes Peak) gold mine

    PDF 1.03 MB

  • Document

    Cripple Creek (Pikes Peak) gold mine.xls

    XLS 442.50 KB

Table of contents

Tables and charts

This report includes 9 images and tables including:

Images

  • Detailed map
  • Production: Image 1
  • Cash costs

Tables

  • Key facts: Table 1
  • Economic assumptions: Table 1
  • Production: Table 1
  • Operations
  • Costs: Table 1
  • Costs: Table 2

You may be interested in

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898