Report summary
The operation comprises three underground mines and two open pit mines. The Inga orebody commenced production in 2017 and by end of 2019, exploration drilling at Pitanga, Palmeiras South, Mangaba, Corpo IV, V and Limoeiro resulted in additional Mineral Resources. Ore is treated in a metallurgical plant with a capacity of 1.5Mtpa and combines CIL and gravimetric circuits. About 45% of the gold is recovered from gravity concentration. Gold recovery is approximately 93.0%.
Table of contents
- Summary
- Key issues
- Mining
- Processing
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Volta Grande gold mine project
A detailed analysis of the Volta Grande gold mine project.
$2,250
Asset Report
Tambo Grande gold mine project
A detailed analysis of the Tambo Grande gold mine project.
$2,250
Asset Report
Tambo Grande copper mine project
A detailed production and cost competitive analysis of the Tambo Grande copper mine project.
$2,250