Asset Report
Crotone zinc smelter
Report summary
Zinc production at Crotone commenced in 1928. However throughout its life the plant proved to be uneconomic to operate. There have been various ownership changes and plans for signifcant capital investment over the years but nothing came to fruition or stemmed the losses. Production at Crotone ceased in February 1999 and dismantling commenced in 2002. Crotone smelter is therefore treated in this analysis as closed.
Table of contents
- Location / Transport
- Roaster
- Acid Plant
- Purification
- Tankhouse
- Casting Plant
- Residue Disposal
- Other
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Asset Report
Valleyfield zinc smelter
A detailed analysis of the Valleyfield zinc smelter.
$2,250
Asset Report
Tak zinc smelter
A detailed analysis of the Tak zinc smelter.
$2,250
Asset Report
Hindustan Zinc (Pre-2005) (Closed) zinc mine
A detailed analysis of the Hindustan Zinc (Pre-2005) zinc mine.
$2,250