Asset Report
Dairi zinc mine project
Report summary
Dairi is a Zn-Pb Sedex deposit located in northern Sumatra. A 30-year production permit was obtained for Dairi project in December 2017. The project is expected to commence first ore production from the Anjing Hitam deposit in 2024. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key Issues
- Emissions
- Mining
- Process
Tables and charts
This report includes 3 images and tables including:
- Dairi Zinc Emission Intensity Quartile Ranking – total global production - tonnes Zn equivalent
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Horne 5 zinc mine project
A detailed analysis of the Horne 5 zinc mine project
$2,250
Asset Report
Corani zinc mine project
A detailed production, commercial and competitive analysis of the Corani zinc mine project.
$2,250
Asset Report
Back Forty zinc mine project
A detailed analysis of the Back Forty zinc mine project.
$2,250