Asset report

Dalgaranga (Closed) gold mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

The original joint venture covered tenements totalling approximately 1200 km2. The capital cost of establishing the mine and infrastructure came into production under budget at A$17.3M. Western Australia introduced a royalty on gold production of 1.25% from July 1998. The royalty increased to 2.5% in July 2000 at gold prices above A$450/oz; remaining at 1.25% if the price is below A$450/oz. In the accompanying analysis we assumed an effective royalty rate of 1.875% for calendar 2000 and...

What's included

This report contains

  • Document

    Dalgaranga (Closed) gold mine

    XLS 121.50 KB

  • Document

    Dalgaranga (Closed) gold mine

    PDF 396.02 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Operations
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898