Dumont nickel project
Loading current market price
Report summary
An updated technical report on the Dumont Project was released by Ausenco in mid 2012. In this report capital costs for the project were revised from 2011 estimates, with initial capital increasing to C$1.2bn, expansion capital to C$814m and sustaining capital to C$846m. Total life-of-mine capital, including contingency, is now estimated at C$2.8m.
What's included
This report contains
Table of contents
- Key facts
- Summary and key issues
-
Location maps
- Detailed map
- Participation
- Geology
- Reserves and resources
-
Operations
- Mining
- Process
- Production
-
Costs
- Cashflow
- Timeline
Tables and charts
This report includes 8 images and tables including:
Images
- Production: Image 1
- Costs: Image 1
- Location maps: Image 1
Tables
- Key facts: Table 1
- Participation: Table 1
- Reserves and resources: Table 1
- Production: Table 1
- Costs: Table 1
You may be interested in
Alouette aluminium smelter
Las Truchas iron ore mine
El Volcan iron ore mine
Questions about this report?
-
Europe:+44 131 243 4699
-
Americas:+1 713 470 1900
-
Asia Pacific:+61 2 8224 8898