El Abra Minesite
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key issues
- Emissions
- CAPEX
- Mining
-
Process
- Crush
- Static Leach
- Dynamic Leach (ceased 2011)
- SxEw
Tables and charts
This report includes the following images and tables:
-
El Abra SxEw Emission Intensity Quartile Ranking - total global production - tonnes Cu equivalentDetailed map
What's included
This report contains:
Other reports you may be interested in
El Soldado copper minesite
A detailed analysis of the El Soldado copper minesite.
$2,250El Abra Mill copper mine project
A detailed analysis of the El Abra Mill copper mine project.
$2,250A record El Niño leaves a lasting dent in fuel demand
A very strong El Niño could cut gasoline, diesel and jet fuel demand by about 350,000 b/d by 2029.
$900